Stormwater Drainage Solutions – Versitank

KHD recently supplied a 120,000 Litre  VersiTank 550 for use as a detention tank for the Amora Estate Town House development in Cairnlea.

[Read more…]

Mulgrave Country Club – Drainage Solutions

In 2012 the Mulgrave Country Club built a new underground carpark under Green #2. This meant the loss of the green for 18 months while a large hole was excavated, the carpark constructed then a new green established on top of the carpark.

[Read more…]

Camberwell Green Roof

Camberwell Green Roof

[Read more…]

USING PORCELAIN TILES WITH VERSIPAVE TILE SUPPORTS

The most versatile paver support available is the Elmich Versipave.

[Read more…]

Melbourne Grammar – Cutting-Edge New Science & Tech Hub

This beautiful, sculptural building stands adjacent to the main oval at the schools’ South Yarra campus. The construction of the new five level Science and Technology Hub replaces an existing science building.

[Read more…]

Swan St Bridge Refurb – Bluestone Cladding

An additional Eastbound vehicular lane and separated cycle & pedestrian lanes in each direction will ease congestion for motorists and provide a safer crossing for pedestrians and cyclists.

[Read more…]

Major Roof Garden Refurbishment, Grattan St Carlton

When Ben Nicholson, from Groof, approached KHD regarding the re-instatement of a 1990’s 1000m2 garden terrace where the waterproofing had failed, the solution was clear.

[Read more…]

Porous Paving Solution for Overflow Car Parking

Most councils insist on permeable surfaces to reduce the pressure on our storm water infrastructure.

[Read more…]

Extensive Renovation in Malvern

We love working with designers and clients who challenge themselves to bring out the best in their homes. This major renovation to a 1930s bungalow in Malvern threw up some interesting challenges.

[Read more…]

Victorian Home Pool Renovation

Australian Bluestone / Natural Stone / Landscape Engineering Products / KHD MelbourneWhen it comes to residential pools, in our experience, they seem to have a 20-30 year lifecycle. Owners change, design preferences change, new regulations come into place, which naturally inspire owners to redevelop existing pools.

[Read more…]