The Meadows Primary School site was formerly home to Meadowbank Primary School which merged with Campmeadows Primary School to form one school.
The building was designed by NOWArchitecture and is registered for a Green Star Education rating, targeting a 6 star rating.
The school enjoys a passive hydrothermal air conditioning where the high raking ceilings allow hot air to rise above activity spaces and exit through upper louvre windows, providing excellent thermal comfort and air quality. Thermal buoyancy expels hot, stale air and pulls fresh air, which has been cooled by the sub-floor water tanks (supplied by KHD), in through floor grilles.
The project won Best New School in Victoria from the Council of Education Facilities Planners International.
KHD has supplied products to many award winning projects.
The Clifton Hill Rail Project began as a key transport initiative to duplicate the railway track between Clifton Hill and Westgarth Stations. The result of which was an opportunity to deliver a landscape that stitched together the Merri Creek environs, a new rail bridge, pedestrian and cyclist needs and the local community.
This Green Wall is featured at the 





